Started a project with the flintwall company last week, who have been contracted to rebuild the east side of the groyne next to Brighton pier. But this is the state of affairs at the moment - all work on hold until temperature rises!
It's a lovely job though; being down on the seafront with a jolly bunch of lads. The flintwork is fun too - big lumps of random laid field flint. There's 80m of groyne wall to build so will be there awhile - if the snow stops!